District-Wide Transport Study
The purpose of the study is to identify the cumulative transport implications of the proposed residential and employment growth within the District and to inform the identification of necessary strategic transport infrastructure improvements. the Study considers all forms of transport and has been produced following discussions with Nottinghamshire County Council and the Highways Agency. Due to the file sizes involved the Study has been split into the following sections:
Figure 4- Newark Urban Network
Figure 5- 2008 Existing AADT Flows
Figure 6- 2008 Existing HGV Flows
Figure 7- 2008 Existing AM Peak Hour Flows
Figure 8- 2008 Existing PM Peak Hour Flows
Figure 9- CRF Existing Link Values
Figure 10- 2008 Existing Network Stress Plan
Figure 11- 2026 Base Committed AM Flows Newark
Figure 12- 2026 Base Committed PM Flows Newark
Figure 13- Existing Bus Service Network
Figure 15- Existing Passenger Rail Network
Figure 16- Existing Public Rights of Way
Figure 17- Existing HGV Weight Restrictions
Figure 18- Committed Cycle and Walking Improvements
Figure 20- Committed within District Flows AADT (Rural Network)
Figure 21- 2026 Committed Development outside the District AA
Figure 22- 2026 Committed Development All Sites AADT (Rural Network)
Figure 23- 2026 Base + Committed Flows AADT (Rural Network)
Figure 24- 2026 Network Stress Plan Base Plus Committed AADT
Figure 25- Growth Site Locations
Figure 26- Employment Development AADT Flows (Rural) Preferred Scenario
Figure 27- Residential Development AADT Flows (Rural) Preferred Scenario
Figure 28- Combined Development AADT Flows (Rural) Preferred Scenario
Figure 29- Total Base + Committed + Combined Development Flows AADT (Rural) Preferred Scenario
For further information please contact Andy Norton on 01636 655855 or Stephen King 01636 655856.